Modeling and parameter estimation of the speed-governing system, turbine and boiler of the unit number 4 of Jinamar power station

L. Rouco P. Centeno F. Fernández-Bernal J. Zamora I. Egido

January 2006 - June 2006

Funding entity Endesa Generación-Unelco


Analysis and simulation of the dynamic response of power systems requires the accurate modeling of the power system components. The aim of this project is the model development and the parameter estimation of the speed-governing system, turbine and boiler of the unit number 4 of Jinamar power station. The steps of the project will be: (1) model development and implementation in a industrial power system simulation package, (2) tests definition, (3) technical assistance during tests and (4) parameter estimation.


Jinamar-Unelco